All posts by Proline Editor

ProLine’s 12-step Program for Contractors Addicted to the Status Quo

Don’t get Mired in the Tar Pit of Stagnant Business

Because We Care

STEP 1: Mark Twain once said, “Denial ain’t just a river in Egypt.”  Avoid the waters of “denial” and recognize that there may be a problem in maintaining the status quo. Acknowledge the positive that can be achieved by changing simple behaviors to increase your earning potential. Accept that there may be additional options available for you to achieve your financial goals. Stop denying yourself opportunities for growth.

STEP 2: Forgive yourself and let go of missed business opportunities. Understand that you are not a bad construction professional. Look to the future with optimism.

STEP 3: Accept radiant heat into your life and bask in its warmth. Envision the benefits―such as increased profits―of snow melting system installations.

Heated paver walkway at outdoor mall.

STEP 4: Recognize that you can enhance your services and build your business without investing additional capital.

STEP 5: Commit yourself to include a snow melting option on all of your future bids.

STEP 6: Understand that you are not alone and that professionals are on hand to support you. Take the unnecessary weight off your shoulders by accepting that you don’t have to be a snow melting system expert. Be positive and embrace the peace of mind that comes from knowing there are radiant heat professionals who are eager to assist you and provide you with all the tools you need to succeed.

STEP 7: Accept new friends and envision the potential benefits of offering radiant heat. Picture a future of sustained growth alongside a dedicated team of professionals who work with you to assist with all the aspects of a snowmelt system installation and ensure your success. You will be empowered by a wealth of resources to install heated driveways, heated floors, roof deicing systems and more. Rest assured that ProLine will work tirelessly with you and take care of the legwork associated with radiant heat installations.

STEP 8: Believe in yourself. Build confidence by consulting freely with snow melting system professionals and completing the free installation training with ProLine Radiant. Use the tools available to boost your confidence and gain faith in your abilities.

STEP 9: Thoughtfully watch the informative “how-to” videos online, and ponder the greater good that can result from gaining wisdom over your competitors.

STEP 10: Understand that your competitors are not evil – just ignorant. Focus on your own brilliance rather than the demise of the competition.

STEP 11: Always seek enlightenment through ProLine’s free services, including consulting, quotes, system design, installation training, and technical support. Use the resources that are available to you.

STEP 12: Share the enlightening message of the 12 Steps with your employees/coworkers and encourage them take the free training courses to ensure a brighter future for you and your company.

Remember, the road to success is always under construction, but finding ways to keep moving forward is the key. This not only keeps you from being run over, but elevates you over your competition. And remember, the professionals at ProLine stand ready and eager to help you succeed – because we care.

The Many Responsibilities of General Contractors

Helping to Ease the Load for General Contractors

The duties and responsibilities of a general contractor (GC) are enormous, to say the least. The necessary expertise includes reviewing and producing project-specific documents and architectural drawings as well as hands-on construction and project management skills. The GC is responsible for all aspects of a construction project and coordinates all the facets of a wide range of commercial and residential construction projects.

Radiant snow melting system installed in a loading ramp

After reviewing upcoming projects, the GC begins the complex process of preparing the proposal and other necessary documents for the client while determining the material needs and hiring the appropriate subcontractors to successfully complete specialized aspects of the project in the time frame provided.

The success of the contractor’s business is dependent on acquiring the building materials that best meet the quality demands and client’s budget criteria as well as hiring competent subcontractors who have proven to deliver quality work in a timely manner. It is the general contractor who is ultimately responsible for every aspect of a construction project, so teaming up with the right material suppliers and subcontractors is vital to the success of the project, the satisfaction of the customer, and reputation of the contractor.

Finding the right suppliers and subcontractors can be a time consuming venture, so most contractors stick to using those whom they’ve worked with before and have proven track records. Still, the most successful contractors always keep an eye open for better prices, workmanship and turnaround.

In the construction industry, word of mouth carries a lot weight, and many contractors benefit by asking other building professionals about their experiences with suppliers or subcontractors. Looking for ways to continually improve one’s business is the hallmark of successful companies. In today’s competitive market, the businesses that survive – and flourish – are those that explore options and consistently seek to optimize efficiency or save money and time without sacrificing quality. And most builders agree that the most effective way to explore options is through word of mouth recommendations.

While most contractors utilize familiar subcontractors for the standard construction needs of a project (framing, roofing, plumbing, etc.), the “less-routine” aspects of some construction jobs require expertise in which some GCs are less familiar. For example, not all contractors are experienced with radiant heat installations, so finding a proven supplier of radiant heat products may pose some unique challenges. As simple as it may sound to find a provider of radiant heat products, the discrepancies between companies can be dramatic, and oftentimes those discrepancies are not discovered until after the contract is signed, or after installation. And who takes the heat for an installation gone wrong?  The general contractor. Fortunately however, there are some telling indicators when it comes to comparing radiant heat companies, and it is this set of indicators that contractors should familiarize themselves with. In addition to word of mouth, use these criteria when evaluating various radiant heat providers.

Installation Support Services by a Dedicated Staff of Technical Experts – Many companies tout their technical services, when in fact, if installers are fortunate enough to talk to someone for technical support during the installation process, they’re likely speaking with a salesperson and not an electrical expert or seasoned installation professional.

ProLine backs up its products with a dedicated support staff. These technical experts understand all the layout and electrical aspects of a radiant heat installation and will take the time necessary to walk you through any issues you may have during the installation.

Detailed System Design and Layout – The top radiant heat companies provide customers with comprehensive system design drawings. These professional layouts are computer assisted drawings (CADs) that should contain a detailed layout of the heat cable, cold lead and contactor panel. The document should also identify the proper layout and materials, load calculations, breaker sizes, and number of breakers. Essentially, all the technical specs and installation information should be contained in the document. When working with an industry leader, customers will understand how the automated system works and how it is expected to perform prior to any installation taking place.

Wide Selection of Products – Check the product lines to make sure that products are available from more than just one manufacturer. You want to be able to select the best solution for your specific radiant heat needs.

Making turns with heating mats

Installation Training – ProLine Radiant is one of the few – if not the only – radiant heat companies that offers several installation training courses – at no cost! To take a free course, customers can call or signup on ProLine’s website. Courses can be attended in person at ProLine Radiant’s headquarters in Utah or attend online via WebEx.

ProLine Radiant is an established radiant heat provider with a proven track record. Contact us today to learn more at 866.676.9276.

Understanding the Power Requirements for a Heated Driveway

Prior to Installing a Snow Melting System

If you’re looking to install a radiant heated driveway for a residential or commercial property, one of the first things you need to confirm is whether you have the necessary power requirements. In most cases, having the power needed to run an efficient radiant snow melting system is not a problem; however, prior to any installation, contractors should work with electricians to determine that the site will have the necessary power for heating the snowmelt area.

Contractors can use the following general information to quickly asses the power needs of a snow melting system. One 30-amp breaker supplies enough power to heat a 170-square foot area. To heat a driveway of 350-square feet, two 30-amp breakers (or one 60-amp breaker) would be needed. Homeowners can check their home’s main breaker panel to see the power coming into the house. (Typical homes feature either two 100 amp panels or two 200 amp breakers. These are located at the top of the main breaker box, above the main breaker panel.)

Snow melting system installed in runaway truck ramp.

If you’re unsure of the square footage of your driveway, no worries; ProLine Radiant can calculate that for you too. In most areas, using a special state-of-the-art technology, ProLine can measure the area of your driveway while talking on the phone with you. Our helpful staff will work closely with you to ensure that the square footage of the area is measured correctly and the power requirements are therefore calculated properly.

On rare occasions when there is insufficient power available to operate a large driveway heating system, the radiant heat system can be laid out in zones. Each zone is powered separately. As a storm first hits, zone 1 would power up and melt the snow in that area of the driveway. After zone 1, zone 2 would then activate to melt the snow in that area of the driveway. Talk to a ProLine representative at 866.676.9276 for more detailed information about zoning your heated driveway.

Contactor panel and box
A contactor panel and box for snow melting system.

When it comes to determining the power requirements for heating a specific area and what power is available, remember that you don’t have to figure this out by yourself. ProLine’s experienced reps are happy to work with you to not only help you determine the necessary power requirements, but to design a system that best meets the customers’ specific snow melting and budget needs. ProLine provides complete system design services, so prior to any installation, customers will know the exact layout and power requirements of the system.

Determining the Operating Cost of an Electric Heated Driveway

Homeowners are also keen to know the general operating costs of a heated driveway. Because radiant snow melting systems are specially designed for the specific demands of the average temperature and snowfall of their location, no two radiant heat systems are exactly alike. However, there is a formula that can be used to help you determine the approximate operating cost of a snow melting system.

General Guidelines to Determine a Heated Driveway’s Operating Cost

  1. Determine the total square footage of the area that will be heated.
  2. Multiply the square footage by the heat required (37 watts per sq. ft. for residential). This will give you a total for the watts per square footage required.
  3. Divide this number by 1,000 to convert to kilowatts.
  4. Look up the kilowatts-per-hour rate from the local power utility company.
  5. Multiply the total watts-per-square footage by the watts-per-hour. This gives you the cost-per-hour of usage for the snow melting system.
  6. NOTE: Heating cables and mats are rated in total watts. If the snowmelt system is intended for a commercial application, then you would multiply the total square footage by 50 watts to get a total wattage required. (E.g., 5,000 sq. ft. x 50 watts = 250,000 watts required.)

Radiant heat provides a range of benefits for home and business owners. The operating costs of automated snow melting systems are typically less than that of hiring professional snow removal services, and can help to extend the life of concrete driveways and keeps them from being subjected to abrasive snow removal methods or harsh snowmelt chemicals or salt. And since the systems are fully automated, business owners can be assured that walks and parking areas remain free from snow and ice during winter storms, enhancing safety for patrons.

Beat the Fall Rush

Install a Radiant Snow Melting System early in the Summer

As contractors well know, the late season rush to complete projects can be hectic – to say the least. That’s why it’s important to encourage homeowners to begin their radiant heat installation projects as early as possible. Spring and early summer is the ideal time for construction projects, and it makes lives for professional builders a little less stressful as cooler weather looms on the horizon. Completing projects early in the summer also allows contractors to take on more business later in the season, increasing the earning potential for the year.

Completing a project in the spring and early summer is beneficial to home and business owners as well. Having a radiant heat system installed well before the arrival of Old Man Winter allows consumers to get familiar with their systems and troubleshoot any issues if necessary.

Heated paver driveway

Whether your customers are looking to pour new concrete or repair existing pavement, radiant heat installation is an excellent way to increase value and lengthen the lifespan of driveways from harsh snow melting chemicals and snow removal equipment. It’s a smart investment that can also benefit business owners by eliminating slick walkways and parking areas to greatly reduce the chances of injury liabilities from pedestrian “slip-and-fall” accidents. Radiant snow melting systems also eliminate the need for time consuming manual snow removal and the possible injuries and lost work time from shoveling.

With radiant heated driveways and walkways, you get energy-efficient, round-the-clock snow removal to keep areas clear of snow and safe for pedestrians. These automated systems operate silently on renewable energy and are maintenance free.

Radiant heat applications are extremely flexible and adaptable, offering homeowners many options to achieve their goals. ProLine will custom design each system to best meet the specific needs of the customer. Consumers have the option to heat entire areas, a strip in the middle of the driveway, or just two 24-inch wide tire tracks. The layout options are virtually limitless.

Snow melting systems can also be installed in existing concrete or asphalt driveways. Saw cut technology can be used to cut grooves in concrete driveways where the cable is placed. A special epoxy is then placed in the grooves, over the cable. To heat existing asphalt driveways, the heat cable is laid out over the old asphalt and then a new layer of asphalt is applied over the cable. ProLine offers special heat cable that is designed to withstand the extreme temperatures of hot asphalt applications.

To better understand the options available, contact ProLine for free consulting or a free estimate. ProLine has the experience and resources to provide contractors with top tier solutions at preferred pricing, all backed by industry leading customer services. And once you’ve installed one ProLine system, we can refer you for future projects in your area. Call 866.676.9276 today to learn more.

Making Ground Fault Protection Requirements Easy

An Easy, Affordable Solution for Ground Fault Protection

In accordance with the National Electrical Code (NEC), all electric snow melting, roof deicing and outdoor pipe heating systems require ground fault protection for safe operation. This often results in time-consuming and costly delays for installers because these breakers can be expensive and difficult to find. However, ProLine has taken steps to eliminate this issue and facilitate a quick, safe installation.

ProLine not only offers contactor panels with built-in ground fault protection, but also offers separate ground fault protection units with snowmelt systems and activation devices. These affordable units provide an easy-to-integrate solution to meet the NEC requirements for snow melting system ground fault protection.

Ground fault protection equipment enclosure

   Ground fault protection equipment enclosure.

ProLine offers two ground fault units: the GF-1 and GF-2. The GF-1 unit provides single-circuit protection and the GF-2 provides dual-circuit protection (for 120/208/240VAC circuits up to 60A). Unlike highly sensitive GFCI breakers, ProLine’s GF unit maintains a 30mA fault trip point to help prevent nuisance tripping. The unique design of the units allows installation of standard, off-the-shelf overload breakers into the customer load center. Installers simply size the breaker and wiring for the system (15A to 60A), and then install the GF unit between the load center branch circuit and the sensor/controller and heat cable. The overload breaker protects the wiring while the GF unit provides the ground fault protection.

The ground fault unit is housed in a rugged, NEMA 4X/IP65 rated enclosure, making it suitable for indoor or outdoor installation. The enclosure’s gasket-sealed front access door allows for easy testing and reset. All internal electronic components are specified for -40°C to +60°C operation. The enclosure is designed so that it can be easily surface-mounted near the load center or near the snow melting system, depending on the installer’s preference. The enclosure also features several “knockouts” to provide flexibility for installation and wiring. The base of the ground fault unit’s enclosure can accommodate standard ½ and ¾-inch conduit hubs. Four mounting holes outside the enclosure gasket make mounting simple while ensuring weather-tight performance.

Features

  • Easy installation; convenient access for wiring
  • Compatible with inexpensive, off-the-shelf overload circuit breakers
  • Provides true 30mA trip point GFPE protection
  • Meets NEC Article 426.28, 427.22, and CEC 62-300 requirements
  • Protects 120/208/240VAC systems up to 60A (#14-#6 CU-only conductor capacity)
  • Not Compatible With 277VAC or L-N-L 240VAC
  • UL listed (U.S. and Canada) NEMA 4X enclosure for indoor or outdoor installation
  • Sealed, hinged front cover that latches for easy testing and reset access
  • No overload rating means only two part numbers for simple stocking
  • Weatherproof and corrosion resistant enclosure
  • Operating temperature range of -40°F/C to +140°F/+60°C

The GF-1 and GF-2 can be used directly with the WS-2C, WS-5C and WS-8C aerial mount snow sensors. The ground fault units can also be used with ProLine contactor panels, switches, and any system up to 60A. Since the overload protection is provided by the load center breaker, only two GF models are required to cover the full range of 15A to 60A, one or two circuits. This allows ground fault protection with kitted systems without having to identify the customer’s load center type or researching whether a combined overload/GFPE breaker is available and how long it will take to receive.

Including a ground fault unit gives installers all the components necessary to complete the snow melting system so that it is ready to install. And the GF unit provides a ready-made solution when installing or retrofitting a snow melting system in an older facility that was wired well before the term “GFPE” was coined. It’s an easy upgrade to help bring an existing system into compliance with modern code requirements. As your radiant heat partner, ProLine makes the process of installing a snowmelt system as easy as possible.